Uganda - Implementation of the Nyagak III Small Hydropower Plant (2 x 2.2 MW) - Consulting Services as Owner's Engineer
The Government of Uganda developed a programme "Efficient and Sustainable Energy Supply in Uganda" for which German KfW committed grant financing for selected investments in the fields of renewable energy and energy efficiency. One of the projects supported under this programme is the construction of Nyagak III Small Hydro Power Project (SHPP). The SHPP is designed as run-of-river plant, with an installed capacity of 2 x 2.2 MW and an expected maximum generation of 27.1 GWh per year.
The Nyagak III SHPP shall be implemented as a public-private partnership (PPP) for which UEGCL and the PPP partner will establish a Special Purpose Vehicle (SPV) that will undertake the construction and operation of the SHPP.
intec's services
Provision of support to UEGCL throughout the design, construction and initial operation of the project, i.e.:
- Risk analysis and outline of strengths and weaknesses of the project with detailed recommendations
- Establishment of indicators to measure the impact of the project (energy cost savings, reduction of pollutants and CO2 emission, economic rate of return, fulfilment of social and environmental safeguards)
- Review and advice to UETCL and the SPV concerning the reporting requirements of the various project agreements
- Review and approval of designs and implementation plans
- Monitoring of and quality assurance of construction works on site
- Monitoring of the implementation of all environmental and social action plans, waste management plans, HSE plans
- Review and approval of invoices
- Advice during testing, commissioning and defects liability period
- Provision of on-the-job training for the client's professionals
Client
Uganda Electricity Generation Company Limited (UEGCL)Financing
KfW EntwicklungsbankPeriod of implementation
2016 - 2019 -
Maldives - Sustainable Energy Development for the outer islands
Maldives has 194 inhabited islands, each of which is electrified with its own diesel-powered mini grid system (total installed diesel generation capacity of 100 MW + 100 MW on the tourism islands). In 2012, the cost of diesel power required government subsidies of more than 40 million US$.
On the other hand, Maldives has significant renewable energy resources, particularly solar and - to a minor extent - wind energy. Given the cost of diesel, the Government initiated two programmes to extend the use of renewable energies in electricity generation. The present project covers the design, tendering, and implementation of hybrid solar / battery / diesel mini-grids on 166 islands, with a total of 25 MW solar (PV) power, a total of 8 MWh storage capacity and 44 diesel power plants. Systems are roof-top or ground-mounted and have a size of between 3.5 kW and 1,600 kW per system.
intec's services
- Feasibility studies and design
- Preparation of bid documents incl. technical specifications
- Management of the bid process
- Evaluation support for award of contract
- Review and approval of Contractor's design
- Project and contract management
- Overseeing project construction commissioning
- Quality assurance
- Capacity building for O&M
- for hybrid solar / battery / diesel mini-grids on 166 islands (in total 25 MW PV, 8 MWh storage capacity) and 44 diesel power plants
Client
Ministry of Environment and Energy on behalf of the Government of MaldivesFinancing
Asian Development Bank (ADB)Period of implementation
2015 - 2019 -
Mauritania - Development of the Eastern Zone Electricity Systems
The project included studies and works supervision services for the following technical measures:
- Construction of hybrid thermal power plants (PV) with related energy storage:
Néma Power Plant: 4 MW diesel, 2 MW solar PV, 500 kW energy storage,
Adel Bagrou Power Plant: 2 MW diesel, 1 MW solar PV, 250 kW energy storage.- Construction of 15, 33, 90 and 225 kV lines:
Centre line Néma - Achemim - Derouich Water Catchment Area (126 km line and MV/LV substations)
Centre line Néma - Amourj - Adel Bagrou - Boghle Water Catchment Area (3 lines with a total length of 255 km, and HV/LV substations)
Centre line Néma - Timbédra (170 km line and HV/LV substations)
Centre line Aioun - Doueirare (35 km line and HV/LV substations)- Reinforcement and development of new electricity distribution networks (0.4 - 33 kV).
intec's services
Phase 1: Studies and Assistance to the Client
- Execution of detailed engineering,
- Execution of detailed design,
- Establishment of tender documents,
- Assistance to SOMELEC during the procurement phase, from tender launch to conclusion of the contracts with the Contractors.
- Environmental and social impact assessment.
Phase 2: Monitoring and Supervision of Works
- Monitoring of the implementation studies,
- Monitoring of equipment manufacturing,
- Participation in testing and factory acceptance tests (FATs),
- Supervision and control of works,
- Monitoring of the training of SOMELEC's staff.
Client
SOMELECFinancing
Mauritanian GovernmentPeriod of implementation
03.2013 - 12.2018
Uganda - Implementation of the Nyagak III Small Hydropower Plant (2 x 2.2 MW) - Consulting Services as Owner's Engineer
The Government of Uganda developed a programme "Efficient and Sustainable Energy Supply in Uganda" for which German KfW committed grant financing for selected investments in the fields of renewable energy and energy efficiency. One of the projects supported under this programme is the construction of Nyagak III Small Hydro Power Project (SHPP). The SHPP is designed as run-of-river plant, with an installed capacity of 2 x 2.2 MW and an expected maximum generation of 27.1 GWh per year.
The Nyagak III SHPP shall be implemented as a public-private partnership (PPP) for which UEGCL and the PPP partner will establish a Special Purpose Vehicle (SPV) that will undertake the construction and operation of the SHPP.
intec's services
Provision of support to UEGCL throughout the design, construction and initial operation of the project, i.e.:
- Risk analysis and outline of strengths and weaknesses of the project with detailed recommendations
- Establishment of indicators to measure the impact of the project (energy cost savings, reduction of pollutants and CO2 emission, economic rate of return, fulfilment of social and environmental safeguards)
- Review and advice to UETCL and the SPV concerning the reporting requirements of the various project agreements
- Review and approval of designs and implementation plans
- Monitoring of and quality assurance of construction works on site
- Monitoring of the implementation of all environmental and social action plans, waste management plans, HSE plans
- Review and approval of invoices
- Advice during testing, commissioning and defects liability period
- Provision of on-the-job training for the client's professionals
Client
Uganda Electricity Generation Company Limited (UEGCL)Financing
KfW EntwicklungsbankPeriod of implementation
2016 - 2019Maldives - Sustainable Energy Development for the outer islands
Maldives has 194 inhabited islands, each of which is electrified with its own diesel-powered mini grid system (total installed diesel generation capacity of 100 MW + 100 MW on the tourism islands). In 2012, the cost of diesel power required government subsidies of more than 40 million US$.
On the other hand, Maldives has significant renewable energy resources, particularly solar and - to a minor extent - wind energy. Given the cost of diesel, the Government initiated two programmes to extend the use of renewable energies in electricity generation. The present project covers the design, tendering, and implementation of hybrid solar / battery / diesel mini-grids on 166 islands, with a total of 25 MW solar (PV) power, a total of 8 MWh storage capacity and 44 diesel power plants. Systems are roof-top or ground-mounted and have a size of between 3.5 kW and 1,600 kW per system.
intec's services
- Feasibility studies and design
- Preparation of bid documents incl. technical specifications
- Management of the bid process
- Evaluation support for award of contract
- Review and approval of Contractor's design
- Project and contract management
- Overseeing project construction commissioning
- Quality assurance
- Capacity building for O&M
- for hybrid solar / battery / diesel mini-grids on 166 islands (in total 25 MW PV, 8 MWh storage capacity) and 44 diesel power plants
Client
Ministry of Environment and Energy on behalf of the Government of MaldivesFinancing
Asian Development Bank (ADB)Period of implementation
2015 - 2019Mauritania - Development of the Eastern Zone Electricity Systems
The project included studies and works supervision services for the following technical measures:
- Construction of hybrid thermal power plants (PV) with related energy storage:
Néma Power Plant: 4 MW diesel, 2 MW solar PV, 500 kW energy storage,
Adel Bagrou Power Plant: 2 MW diesel, 1 MW solar PV, 250 kW energy storage.
- Construction of 15, 33, 90 and 225 kV lines:
Centre line Néma - Achemim - Derouich Water Catchment Area (126 km line and MV/LV substations)
Centre line Néma - Amourj - Adel Bagrou - Boghle Water Catchment Area (3 lines with a total length of 255 km, and HV/LV substations)
Centre line Néma - Timbédra (170 km line and HV/LV substations)
Centre line Aioun - Doueirare (35 km line and HV/LV substations)
- Reinforcement and development of new electricity distribution networks (0.4 - 33 kV).
intec's services
Phase 1: Studies and Assistance to the Client
- Execution of detailed engineering,
- Execution of detailed design,
- Establishment of tender documents,
- Assistance to SOMELEC during the procurement phase, from tender launch to conclusion of the contracts with the Contractors.
- Environmental and social impact assessment.
Phase 2: Monitoring and Supervision of Works
- Monitoring of the implementation studies,
- Monitoring of equipment manufacturing,
- Participation in testing and factory acceptance tests (FATs),
- Supervision and control of works,
- Monitoring of the training of SOMELEC's staff.
Client
SOMELECFinancing
Mauritanian GovernmentPeriod of implementation
03.2013 - 12.2018-
Morocco - NOOR Midelt Solar Power Complex CSP Program
NOOR Midelt ("NOORM") is the second solar power complex to be developed in the framework of Morocco's NOOR Solar Plan. It covers an area of about 2,400 hectares and is located some 25 km northeast of the city of Midelt. The total capacity shall be between 800-1600 MW, and the plant will comprise different CSP and PV technologies.
The project covers the development of one or more projects under an independent power production (IPP) scheme. The pertinent consulting services are the following:
- Feasibility study, selection of preferred technologies and recommended project configuration, incl. the 225 kV grid connection
- Preparation of the Request for Pre-Qualification (RfQ) documents and management of the qualification process
- Preparation of 2-stage Request for Proposal (RfP) documents and management of the tendering procedure
- Bid evaluation, assistance during contract award and finalization of all project agreements.
- Grid study report: 850 MW solar PV/CSP integration into the Moroccan power system:
Grid connection layout
Static analysis
Dynamic analysis
Study of harmonics
Cost assessment grid connection
Overall assessment of the fluctuating power impact into the grid
Report preparation
- Industrialisation study
intec's services
intec leads the following project activities:
- Feasibility Study: site assessment and configuration, preliminary Environmental Impact Assessment (EIA) and Development Impact Assessment (DIA), final study report
- Preparation of RfQ document: definition of evaluation criteria, grid and methodology, final prequalification evaluation report
- Preparation of 2-stage RfP: planning of the overall bid process, technical bid evaluation report
- Contract award and agreements: contract negotiations and related documents
- Grid study report and extension of PV technology
- Industrialisation study in relation to Hybrid CSP/PV
Furthermore, it contributes to the following tasks:
- Economic and financial analysis for the feasibility study
- Technical input to the RfQ documents
- Preparation of the RfPs: technical specifications, project agreements, technical bid evaluation
- Energy economics calculation and comparisons PV/CSP versus CSP only
In addition, a team of experts is made available to carry out special assignments for MASEN.
Client
Moroccan Agency for Solar Energy (MASEN)Financing
MASENPeriod of implementation
31.12.2014 - 31.12.2018 -
Ukraine - South Ukraine Regional Transmission Network Development
NPC Ukrenergo aims at de-bottlenecking the regional network (up to 750 kV) in South Ukraine for more efficient and reliable power supply and at accelerating the integration of solar and wind power into the national power grid within the next 15 years. The Consultant was appointed to assist NPC Ukrenergo to assess the implication of installing sizeable solar and wind power generation capacities in Ukraine.
The project is divided in two phases:
- Phase I: Regional Power Network Development Master Plan and Solar & Wind Power Integration Assessment
- Phase II - Project Preparation of Two Priority Investment Packages.
The assignment has the following main tasks:
- Master planning of the regional power network development at 750, 330, 220 and 110 kV voltage levels in South Ukraine with a 5 and 15-year perspective;
- Determination of the appropriate levels of wind and solar power capacity and appropriate operational and technical parameters for management of such connected capacity;
- Drafting necessary documents regulating technical aspects of solar and wind energy operation in Ukraine;
- Identifying the short and medium-term investments needed to strengthen the regional grid and to increase the capacity of wind and solar power that could be connected in South Ukraine;
- Determination of the required spare generating capacity in an interconnected power system (IPS) based on power balance analysis, type and operational parameters of such generating capacity to compensate fluctuating energy supply by large commercial-scale wind and solar power plants;
- Prioritisation of construction/reinforcement projects to be implemented by 2030;
- Strengthening the Client's capacity to perform better network planning and operation;
- Performing comprehensive technical, economic, commercial and socio environmental feasibility assessment of two projects prioritised among those identified in the master plan.
- Project preparation for the two packages (technical specifications, BoQ, line route review, technical, economic and financial analyses, ESIA, project feasibility, project tender documentation).
intec's services
- Demand forecast and generation expansion plan;
- Review and assessment of existing network planning and operation in view of solar and wind power integration (grid code, operation, load dispatch and wind forecast, control and metering systems);
- Network planning (110 kV and above) for the South Ukrainian grid for the integration of solar and wind power (load flow, N-1, stability analysis, mitigation measures) and related training;
- Establishment of a Geographical Information System (GIS);
- Preparation of the Master Plan with selection and definition of two priority investment packages;
- Project preparation for the two packages (grid stability analysis, technical specifications, BoQ, line route review, technical, economic and financial analyses, ESIA, project feasibility, project tender documentation)
Client
NPC UkrenergoFinancing
European Bank for Reconstruction and Development (EBRD)Period of implementation
24.10.2012 - 22.12.2018 -
Madagascar - Promotion of rural electrification through renewable energies in Madagascar
In 2015, the Government of Madagascar founded the "Programme Hydroélectriques Prioritaires" (PHP) which prioritizes the development of 5 hydropower sites as well as 13 hybrid sites. In late 2015, the Ministry of Energy (MEH) published a tender for the development of 4 hydropower sites on the basis of IPP and EPC contracts and signed provisional adjudications with 4 consortia of private companies for the development of detailed feasibility studies and plans for the realization of the projects: Sahofika, 300 MW (IPP); Volobe, 90 MW (IPP); Ambodiroka, 42 MW (EPC); Antetezambato, 120 MW (EPC).
The goal of this project is to support the Ministry of Energy in the evaluation and validation of technical and financial feasibility studies as well as negotiating power purchase agreements between Jirama and the private operators for the 4 hydropower stations.
intec's services
- Supporting MEH and its related organizations in the evaluation of the technical, environmental, and financial aspects of the studies and procurement of the contracts;
- Evaluation of the ecological, environmental and social aspects according to international standards (ESIA);
- Evaluation of the technical assumptions of the financial model prepared by the provisional purchasers, and assessment of financial aspects and risks for the projects;
- Support MEH on the validation of the financing structures proposed by the developers and investment values repayable by the Malagasy State on procurement and funding issues;
- Evaluation of the commercial conditions of the project offers;
- Capacity building of MEH and its related organizations to finalize the technical and financial aspects of the documentation including construction contracts and / or concession contracts, power purchase agreements, operation contracts and contracts of maintenance ;
- Capacity building of MEH staff and related agencies in terms of IPP and EPC contract negotiations
Client
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ)Financing
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ)Period of implementation
28.09.2017 - 30.11.2018
Morocco - NOOR Midelt Solar Power Complex CSP Program
NOOR Midelt ("NOORM") is the second solar power complex to be developed in the framework of Morocco's NOOR Solar Plan. It covers an area of about 2,400 hectares and is located some 25 km northeast of the city of Midelt. The total capacity shall be between 800-1600 MW, and the plant will comprise different CSP and PV technologies.
The project covers the development of one or more projects under an independent power production (IPP) scheme. The pertinent consulting services are the following:
- Feasibility study, selection of preferred technologies and recommended project configuration, incl. the 225 kV grid connection
- Preparation of the Request for Pre-Qualification (RfQ) documents and management of the qualification process
- Preparation of 2-stage Request for Proposal (RfP) documents and management of the tendering procedure
- Bid evaluation, assistance during contract award and finalization of all project agreements.
- Grid study report: 850 MW solar PV/CSP integration into the Moroccan power system:
Grid connection layout
Static analysis
Dynamic analysis
Study of harmonics
Cost assessment grid connection
Overall assessment of the fluctuating power impact into the grid
Report preparation
- Industrialisation study
intec's services
intec leads the following project activities:
- Feasibility Study: site assessment and configuration, preliminary Environmental Impact Assessment (EIA) and Development Impact Assessment (DIA), final study report
- Preparation of RfQ document: definition of evaluation criteria, grid and methodology, final prequalification evaluation report
- Preparation of 2-stage RfP: planning of the overall bid process, technical bid evaluation report
- Contract award and agreements: contract negotiations and related documents
- Grid study report and extension of PV technology
- Industrialisation study in relation to Hybrid CSP/PV
Furthermore, it contributes to the following tasks:
- Economic and financial analysis for the feasibility study
- Technical input to the RfQ documents
- Preparation of the RfPs: technical specifications, project agreements, technical bid evaluation
- Energy economics calculation and comparisons PV/CSP versus CSP only
In addition, a team of experts is made available to carry out special assignments for MASEN.
Client
Moroccan Agency for Solar Energy (MASEN)Financing
MASENPeriod of implementation
31.12.2014 - 31.12.2018Ukraine - South Ukraine Regional Transmission Network Development
NPC Ukrenergo aims at de-bottlenecking the regional network (up to 750 kV) in South Ukraine for more efficient and reliable power supply and at accelerating the integration of solar and wind power into the national power grid within the next 15 years. The Consultant was appointed to assist NPC Ukrenergo to assess the implication of installing sizeable solar and wind power generation capacities in Ukraine.
The project is divided in two phases:
- Phase I: Regional Power Network Development Master Plan and Solar & Wind Power Integration Assessment
- Phase II - Project Preparation of Two Priority Investment Packages.
The assignment has the following main tasks:
- Master planning of the regional power network development at 750, 330, 220 and 110 kV voltage levels in South Ukraine with a 5 and 15-year perspective;
- Determination of the appropriate levels of wind and solar power capacity and appropriate operational and technical parameters for management of such connected capacity;
- Drafting necessary documents regulating technical aspects of solar and wind energy operation in Ukraine;
- Identifying the short and medium-term investments needed to strengthen the regional grid and to increase the capacity of wind and solar power that could be connected in South Ukraine;
- Determination of the required spare generating capacity in an interconnected power system (IPS) based on power balance analysis, type and operational parameters of such generating capacity to compensate fluctuating energy supply by large commercial-scale wind and solar power plants;
- Prioritisation of construction/reinforcement projects to be implemented by 2030;
- Strengthening the Client's capacity to perform better network planning and operation;
- Performing comprehensive technical, economic, commercial and socio environmental feasibility assessment of two projects prioritised among those identified in the master plan.
- Project preparation for the two packages (technical specifications, BoQ, line route review, technical, economic and financial analyses, ESIA, project feasibility, project tender documentation).
intec's services
- Demand forecast and generation expansion plan;
- Review and assessment of existing network planning and operation in view of solar and wind power integration (grid code, operation, load dispatch and wind forecast, control and metering systems);
- Network planning (110 kV and above) for the South Ukrainian grid for the integration of solar and wind power (load flow, N-1, stability analysis, mitigation measures) and related training;
- Establishment of a Geographical Information System (GIS);
- Preparation of the Master Plan with selection and definition of two priority investment packages;
- Project preparation for the two packages (grid stability analysis, technical specifications, BoQ, line route review, technical, economic and financial analyses, ESIA, project feasibility, project tender documentation)
Client
NPC UkrenergoFinancing
European Bank for Reconstruction and Development (EBRD)Period of implementation
24.10.2012 - 22.12.2018Madagascar - Promotion of rural electrification through renewable energies in Madagascar
In 2015, the Government of Madagascar founded the "Programme Hydroélectriques Prioritaires" (PHP) which prioritizes the development of 5 hydropower sites as well as 13 hybrid sites. In late 2015, the Ministry of Energy (MEH) published a tender for the development of 4 hydropower sites on the basis of IPP and EPC contracts and signed provisional adjudications with 4 consortia of private companies for the development of detailed feasibility studies and plans for the realization of the projects: Sahofika, 300 MW (IPP); Volobe, 90 MW (IPP); Ambodiroka, 42 MW (EPC); Antetezambato, 120 MW (EPC).
The goal of this project is to support the Ministry of Energy in the evaluation and validation of technical and financial feasibility studies as well as negotiating power purchase agreements between Jirama and the private operators for the 4 hydropower stations.
intec's services
- Supporting MEH and its related organizations in the evaluation of the technical, environmental, and financial aspects of the studies and procurement of the contracts;
- Evaluation of the ecological, environmental and social aspects according to international standards (ESIA);
- Evaluation of the technical assumptions of the financial model prepared by the provisional purchasers, and assessment of financial aspects and risks for the projects;
- Support MEH on the validation of the financing structures proposed by the developers and investment values repayable by the Malagasy State on procurement and funding issues;
- Evaluation of the commercial conditions of the project offers;
- Capacity building of MEH and its related organizations to finalize the technical and financial aspects of the documentation including construction contracts and / or concession contracts, power purchase agreements, operation contracts and contracts of maintenance ;
- Capacity building of MEH staff and related agencies in terms of IPP and EPC contract negotiations