Projects worldwide
intec has executed and is implementing large and complex projects in nearly all regions of the world.
The projects listed on the website represent only a selection of our project references.
Our projects
-
Burkina Faso - Fada N'Gourma Thermal Power Station
The project consists in the expansion of the production capacity of the Fada N'Gourma by installing two new diesel generators (HFO) with an exploitable capacity of between 3.75 and 4.5 MW each.
intec's services
- Coordination, supervision and management of the contract
- Technical control of designs
- Factory acceptance testing
- Supervision of works execution on site
- Supervision of completion of works and commissioning
- Reporting
Client
Société Nationale d'Electricité du Burkina (SONABEL)Financing
World BankPeriod of implementation
2/2017 - 5/2019 -
Jordan - 100 MW Wind Power Plant located at Tafilha 4
The objective of this assignment is to support the client throughout the development and implementation of the 100 MW wind power project, from procurement phase to the final acceptance and commercial operation date.
These services include amongst others design and engineering review, bid evaluation, project management, site supervision during construction and commissioning, factory inspections, reporting and scheduling, documentation and local logistic support.
intec's services
Phase 1:
- Preliminary document review and site visits
- Wind data analysis and wind resource assessment
- Support for the Environmental and Social Impact Assessment (ESIA)
- Power evacuation studies review
- Topographical survey review
- Assist the client to obtain the required permits and licenses
- Support during the procurement phase of the EPC and O&M contractors: support during bid evaluation and contract negotiations
- Draft of EPC and O&M contracts
Phase 2:
- Supervision of construction and commissioning
- Witnessing of Factory Acceptance Tests (FAT)
Client
Mass Jordan for Renewable Energy LtdFinancing
Mass Jordan for Renewable Energy LtdPeriod of implementation
15.1.2017 - 30.3.2019 - -
Romania - 110 kV to 750 kV overhead lines
The contract involves providing consultancy services and analysis of solutions in order to achieve safe and efficient operations for 110 kV to 750 kV overhead lines: services for all activities related to OHLs; consultancy for rocurement and supply of materials; consultancy for drafting normative activities, technical specifications, regulations, etc. related to OHLs.
intec's services
- Basic and detailed design
- Feasibility studies
- Elaboration of technical specifications
- Elaboration of design norms and prescriptions
- Financial and risk analyses
- Elaboration of technical documentation for land acquisition, permits and authorizations
Client
C.N.T.E.E. TRANSELECTRICA S.A.Financing
TRANSELECTRICAPeriod of implementation
29.2.2016 - 28.2.2019
Burkina Faso - Fada N'Gourma Thermal Power Station
The project consists in the expansion of the production capacity of the Fada N'Gourma by installing two new diesel generators (HFO) with an exploitable capacity of between 3.75 and 4.5 MW each.
intec's services
- Coordination, supervision and management of the contract
- Technical control of designs
- Factory acceptance testing
- Supervision of works execution on site
- Supervision of completion of works and commissioning
- Reporting
Client
Société Nationale d'Electricité du Burkina (SONABEL)Financing
World BankPeriod of implementation
2/2017 - 5/2019Jordan - 100 MW Wind Power Plant located at Tafilha 4
The objective of this assignment is to support the client throughout the development and implementation of the 100 MW wind power project, from procurement phase to the final acceptance and commercial operation date.
These services include amongst others design and engineering review, bid evaluation, project management, site supervision during construction and commissioning, factory inspections, reporting and scheduling, documentation and local logistic support.
intec's services
Phase 1:
- Preliminary document review and site visits
- Wind data analysis and wind resource assessment
- Support for the Environmental and Social Impact Assessment (ESIA)
- Power evacuation studies review
- Topographical survey review
- Assist the client to obtain the required permits and licenses
- Support during the procurement phase of the EPC and O&M contractors: support during bid evaluation and contract negotiations
- Draft of EPC and O&M contracts
Phase 2:
- Supervision of construction and commissioning
- Witnessing of Factory Acceptance Tests (FAT)
Client
Mass Jordan for Renewable Energy LtdFinancing
Mass Jordan for Renewable Energy LtdPeriod of implementation
15.1.2017 - 30.3.2019 -Romania - 110 kV to 750 kV overhead lines
The contract involves providing consultancy services and analysis of solutions in order to achieve safe and efficient operations for 110 kV to 750 kV overhead lines: services for all activities related to OHLs; consultancy for rocurement and supply of materials; consultancy for drafting normative activities, technical specifications, regulations, etc. related to OHLs.
intec's services
- Basic and detailed design
- Feasibility studies
- Elaboration of technical specifications
- Elaboration of design norms and prescriptions
- Financial and risk analyses
- Elaboration of technical documentation for land acquisition, permits and authorizations
Client
C.N.T.E.E. TRANSELECTRICA S.A.Financing
TRANSELECTRICAPeriod of implementation
29.2.2016 - 28.2.2019-
Cambodia - Extension of the medium distribution grid
The objective of the project is to upgrade and expand distribution and transmission infrastructure for increased access to energy, improved electricity services for the rural population and to contribute to primary energy savings.
The tentative scope of the project is the following:- Component 1: Extension of the medium distribution grid (either 22 kV or/and 35 kV, incl. station transformers) in the rural areas
- Component 2: Construction of two new 115/22 kV grid AIS and GIS substations for strengthening the power evacuation to the 22 kV grid
intec in its role as the Consultant shall undertake investigations to assess the technical and economic justification of the planned transmission system expansion.
intec's services
- Brief review of the context of the power sector
- Assessment of the power sub-sector transmission & distribution in the project area, incl. a network analysis
- Survey of AIS and GIS substation areas and review of conceptual AIS and GIS substation design, and provision of an analysis of a potential new AIS and GIS substation
- Review of a future AIS and GIS Substation in the centre of Siem Reap
- Review of proposed enhancement of the MV transmission system
- Identification of additional investment needs
- Conceptual Design of the proposed measures
- Review of operation and maintenance concept and identification of training needs
- Cost estimates and investment budget
- Impact assessment and indicators (climate mitigation, access to electricity, local economic development)
- Economic and financial analysis
- Draft implementation concept, procurement plan and project timetable
- Risk assessment
Client
Electricité du Cambodge represented by KfWFinancing
KfW Development BankPeriod of implementation
08.2018 - 02.2019 -
Serbia - EHS services for the Čibuk 1 Wind Farm Project
Vetroelecktrane is developing and executing, together with their major shareholders Abu Dhabi Future Energy Company-Masdar and Continental Wind Partners (CWP), a wind farm consisting of 57 Wind Turbine Generators (WTGs) of 110m hub height and 2.8 MW rated power, main transformer station and corresponding infrastructure. The consultant has been appointed by the client to manage the project as owner's engineer, providing Project Management Consulting Services (PMC) and site supervision services (including design review, procurement, supervision of construction, commissioning, start-up and testing) as well as technical advice and support during negotiations with third parties.
intec's services
The EHS activities relevant to the project comprise the following:
Provide assistance to the client with any local authorities or other stakeholders.
Performance of all health and safety activities prescribed by the Serbian law
Provide assistance with maintaining compliance with EBRD and IFC requirements
Supervision of all activities in relation to the connection to the utility network and services performed in relation to the Environmental Management Plan
- Technical and legal assistance during contracts' execution (review of design documentation and its compliance with the ESAP, supervision of contractors' works, assistance in project management, assistance during defect notification period)
- Monitor the mitigation measures undertaken by the Contractor or other third parties during the construction and commissioning phases and review and provide comments on all environmental reports
- Assistance in the implementation of the ESAP/ESMPP
- Performance of inspection, site supervision, health & safety, environmental activities
The above activities were carried out in the framework of the Čibuk 1 Wind Farm Project.
Client
Vetroelecktrane Balcana (VEBG) D.O.OFinancing
Vetroelecktrane Balcana (VEBG) D.O.OPeriod of implementation
03.2017 - 01.2019 -
Serbia - Čibuk 1 Wind Farm Project
Vetroelecktrane is developing and executing, together with their major shareholders Abu Dhabi Future Energy Company-Masdar and Continental Wind Partners (CWP), a wind farm consisting of 57 Wind Turbine Generators (WTGs) of 110m hub height and 2.8 MW rated power, 86 km 35 kV cables, main transformer station (35 kV/400 kV; 2x 90 MVA), 11 km double circuit 400 kV OHL and corresponding infrastructure. The consultant has been appointed by the client to manage the project as owner's engineer, providing Project Management Consulting Services (PMC) and site supervision services (including design review, procurement, construction supervision, commissioning, start-up and testing) as well as technical advice and support during negotiations with third parties. The scope includes the following work packages:
- Work Package 2a: Engineering Services
- Work Package 2b: Construction Management and Site Supervision
- EDMS: Electronic Document Management Services
intec's services
- Establish project and document management structures
- Provide technical assistance to the client with any local authorities or other stakeholders.
- Review the design and engineering works carried out by the EPC contractor
- Contribute to the risk assessment (RA)
- Constructability review with the EPC contractors and other stakeholders
- EPC and project documentation review
- Performance of project controls (quality, cost and schedule, document, reporting, testing, factory inspection, health & safety, environmental, site inspection)
- Review of the contractor´s plan for site management and site supervision
- Performance of all health and safety activities prescribed by the Serbian law
- Provide assistance with maintaining compliance with EBRD and IFC requirements
- Supervision of all activities in relation to the connection to the utility network and services performed in relation to the Environmental Management Plan
Client
Vetroelecktrane Balcana (VEBG) D.O.OFinancing
Vetroelecktrane Balcana (VEBG) D.O.OPeriod of implementation
15.03.2017 - 30.01.2019
Cambodia - Extension of the medium distribution grid
The objective of the project is to upgrade and expand distribution and transmission infrastructure for increased access to energy, improved electricity services for the rural population and to contribute to primary energy savings.
The tentative scope of the project is the following:
- Component 1: Extension of the medium distribution grid (either 22 kV or/and 35 kV, incl. station transformers) in the rural areas
- Component 2: Construction of two new 115/22 kV grid AIS and GIS substations for strengthening the power evacuation to the 22 kV grid
intec in its role as the Consultant shall undertake investigations to assess the technical and economic justification of the planned transmission system expansion.
intec's services
- Brief review of the context of the power sector
- Assessment of the power sub-sector transmission & distribution in the project area, incl. a network analysis
- Survey of AIS and GIS substation areas and review of conceptual AIS and GIS substation design, and provision of an analysis of a potential new AIS and GIS substation
- Review of a future AIS and GIS Substation in the centre of Siem Reap
- Review of proposed enhancement of the MV transmission system
- Identification of additional investment needs
- Conceptual Design of the proposed measures
- Review of operation and maintenance concept and identification of training needs
- Cost estimates and investment budget
- Impact assessment and indicators (climate mitigation, access to electricity, local economic development)
- Economic and financial analysis
- Draft implementation concept, procurement plan and project timetable
- Risk assessment
Client
Electricité du Cambodge represented by KfWFinancing
KfW Development BankPeriod of implementation
08.2018 - 02.2019Serbia - EHS services for the Čibuk 1 Wind Farm Project
Vetroelecktrane is developing and executing, together with their major shareholders Abu Dhabi Future Energy Company-Masdar and Continental Wind Partners (CWP), a wind farm consisting of 57 Wind Turbine Generators (WTGs) of 110m hub height and 2.8 MW rated power, main transformer station and corresponding infrastructure. The consultant has been appointed by the client to manage the project as owner's engineer, providing Project Management Consulting Services (PMC) and site supervision services (including design review, procurement, supervision of construction, commissioning, start-up and testing) as well as technical advice and support during negotiations with third parties.
intec's services
The EHS activities relevant to the project comprise the following:
Provide assistance to the client with any local authorities or other stakeholders.
Performance of all health and safety activities prescribed by the Serbian law
Provide assistance with maintaining compliance with EBRD and IFC requirements
Supervision of all activities in relation to the connection to the utility network and services performed in relation to the Environmental Management Plan
- Technical and legal assistance during contracts' execution (review of design documentation and its compliance with the ESAP, supervision of contractors' works, assistance in project management, assistance during defect notification period)
- Monitor the mitigation measures undertaken by the Contractor or other third parties during the construction and commissioning phases and review and provide comments on all environmental reports
- Assistance in the implementation of the ESAP/ESMPP
- Performance of inspection, site supervision, health & safety, environmental activities
The above activities were carried out in the framework of the Čibuk 1 Wind Farm Project.
Client
Vetroelecktrane Balcana (VEBG) D.O.OFinancing
Vetroelecktrane Balcana (VEBG) D.O.OPeriod of implementation
03.2017 - 01.2019Serbia - Čibuk 1 Wind Farm Project
Vetroelecktrane is developing and executing, together with their major shareholders Abu Dhabi Future Energy Company-Masdar and Continental Wind Partners (CWP), a wind farm consisting of 57 Wind Turbine Generators (WTGs) of 110m hub height and 2.8 MW rated power, 86 km 35 kV cables, main transformer station (35 kV/400 kV; 2x 90 MVA), 11 km double circuit 400 kV OHL and corresponding infrastructure. The consultant has been appointed by the client to manage the project as owner's engineer, providing Project Management Consulting Services (PMC) and site supervision services (including design review, procurement, construction supervision, commissioning, start-up and testing) as well as technical advice and support during negotiations with third parties. The scope includes the following work packages:
- Work Package 2a: Engineering Services
- Work Package 2b: Construction Management and Site Supervision
- EDMS: Electronic Document Management Services
intec's services
- Establish project and document management structures
- Provide technical assistance to the client with any local authorities or other stakeholders.
- Review the design and engineering works carried out by the EPC contractor
- Contribute to the risk assessment (RA)
- Constructability review with the EPC contractors and other stakeholders
- EPC and project documentation review
- Performance of project controls (quality, cost and schedule, document, reporting, testing, factory inspection, health & safety, environmental, site inspection)
- Review of the contractor´s plan for site management and site supervision
- Performance of all health and safety activities prescribed by the Serbian law
- Provide assistance with maintaining compliance with EBRD and IFC requirements
- Supervision of all activities in relation to the connection to the utility network and services performed in relation to the Environmental Management Plan